A factory produces bicycles at a rate of 80+0.5t^2-0.7t bicycles per week (t in weeks). How many bicycles were produced from day 15 to 28?
.
.
1 Answer
Mar 12, 2016
Explanation:
The function production is given as
The interval to be considered is from day 15 to 28. Or from the third (included) to the fourth week.
For integration purposes it is from the second (it marks the limit of the region to be excluded ) to the fourth week.
So the result is given by
#int_2^4 (80+t^2/2-0.7t)dt=#
#=(80t+t^3/6-0.35t^2)|_2^4#
#=(320+64/6-0.35*16)-(160+8/6-0.35*4)#
#=320+32/3-5.6-160-4/3+1.4#
#=160+28/3-4.2~=165.13# =>#165# bicycles